Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the facebook-pagelike-widget domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the live-weather-station domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6121
Damaged ceiling from rain keeps Central Intermediate School closed for repairs, testing – Wadsworth Community Radio

Wadsworth Community Radio

No school again Friday, May 5 for students who attend Central Intermediate School. The district says damage to a portion of the ceiling on the third floor of the building needs repaired. The ceiling that was damaged, which sits above the drop ceiling, was installed in 1927 and is made of plaster.

On Thursday, the EA Group, a company specializing in asbestos testing, took samples. While there was a trace amount of asbestos found, the trace amount isn’t regulated by the EPA. However, as a precautionary measure, the EA Group has recommended a full environmental cleaning of the impacted area completed followed by air quality testing.

If everything goes as planned, and the results of the testing show the air quality levels to be within normal range, CIS will reopen on Monday.

Categories: News

Tina Heiberg

Tina happily lives in her princess palace with her husband, 3 young sons and dog.