Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the facebook-pagelike-widget domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the live-weather-station domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6121
I-76/SR 94 Construction Project moves on – Wadsworth Community Radio

Wadsworth Community Radio

STATE ROUTE 94 SIGN JJThe City of Wadsworth wants to remind motorists who drive through the Interstate 76/State Route 94 construction project that there will be intermittent lane closures this week.

Construction crews on High Street are performing waterline, drainage and erosion control work throughout the project site on State Route 94.

On the High Street Bridge (State Route 94 bridge) over Interstate 76, there are only two lanes of traffic open in each direction. The left-hand lanes are used for making turns. The right-hand lanes are used for through traffic.

On I-76, there may be possible intermittent single-lane closures both east and west bound for survey and bridge work.

Categories: Construction

Joe Jastrzemski

Joe has spent most of his professional life covering sports, from the pros to high school, both boys and girls. He is currently the PA voice of Cleveland State Sports, Ursuline College basketball and Highland High School Basketball.